T-TRACK revolutionizes railway construction with its streamlined and efficient design, offering significant advantages over conventional ballasted systems. The ballast-less technology simplifies construction processes, reduces material handling, and minimizes site preparation. With faster installation times, reduced labor requirements, and the ability to adopt a multi-nodal construction approach, T-TRACK ensures timely project completion while maintaining the highest standards of quality and precision.
| T-TRACK | BALLASTED TRACK |
|---|---|
| Modular Computer Controlled Assembly | Tamped Sleepers & Ballast |
| Simple Mechanistic Installation | Complex Installation |
| Multi-Nodal Installation Simultaneously | Single Node Installation |
| No Ballast Screening or Tamping Required | All Required |
| No Ballast Wagons Required or Traction equipment | Need Ballast Wagons, tamping machines, ballast profilers and Trains |
| Construction Can Be Completed with Limited Rail on Site | Need continuous Rail feed during construction |
| “ONCE OFF” Simple Track Alignment | Multiple Alignment Necessary |
| Curves – Pre-Fabricated prior to delivery on Site | Specialist Equipment Required |
| Simple Fabrication and Assembly on Site | Sophisticated Mechanized Machinery Required |
| Construction Schedules are accelerated reducing implementation time significantly | Rate of Progress Limited |
| Simplified Logistics | Complex Logistics |